Slingshot Collective
Well-known member
- Joined
- Jun 14, 2012
- Messages
- 142
- Reaction score
- 206
- Location
- Berkeley Calif
- Website
- slingshot.tao.ca
"Sandusky, IA – On Saturday, September 24th, 2016, a non-violent direct action out of the Mississippi Stand camp shutdown Dakota Access Pipeline construction at the point the pipeline will cross the Mississippi river at Sandusky, Iowa.
"The action, which started with a six a.m. lock-down by three people (pictured below), and included two more actions, stopped work at the construction site for the day."
Taken from:
http://www.unicornriot.ninja/?p=9451
"The action, which started with a six a.m. lock-down by three people (pictured below), and included two more actions, stopped work at the construction site for the day."
Taken from:
http://www.unicornriot.ninja/?p=9451