Better a week late than never...
Fitted tiling above the kitchen. Decided to use CT1 rather than tile adhesive cos the bulkhead flexes a little and I don't want them falling off.
View attachment 57608
Looks pretty good.
View attachment 57609
Got the bracing welded in for the spare finally.
View attachment 57610
Bit of cheapo rattle can.
View attachment 57611
Bolted the carrier back up and for reasons lost on me 2 of the bolts cross threaded half way down the bolt, so I had to cut two m10 stainless bolts out. Absolute pain in the arse.
View attachment 57612
Then moved on to the floor - I bought some cheap self adhesive lvt online. I was quite apprehensive about laying it but it went down super easy in an hour or so.
View attachment 57613
View attachment 57614
Fully stabbed myself in the finger with a brand new blade in Stan during the process, but fortunately most the blood went under where the floor now is, and the 2 or 3 splatters on other stuff should wipe off.
Headboard on the bed. I only have a shot from the back. I've not detailed the process but by this point we all know it's some PSE timber screwed to ply and painted with green emulsion.
View attachment 57615
Also got the panel on the bottom of the sliding door.
View attachment 57616
And the cushions + mattress arrived.
View attachment 57617
Excuse the mattress sticking up, I didn't want to shove it into the space until it had finished expanding. It'll only stick up a few cm above that top board when it's fully seated.
View attachment 57618
Mattress fully expanded and in place.
View attachment 57619
And lined the back doors with some recycled coffee sacks.
View attachment 57620
View attachment 57621
And to top it off we took the van out for a night finally for a shakedown run.
View attachment 57622
View attachment 57623
View attachment 57624